 |
|
|
Description of Sites
There are 7 sites used in sampling College Brook. They are:
- CB0:
Just past the culvert that goes underneath Mast Road near the
U.S. Forestry building **
- CB1:
At the end of Boulder Field, just before the culvert where College
Brook goes under the access road
- CB2:
At the culvert just before entering the railroad tracks
- CB3A:
A small drainage stream that drains into College Brook just before
the railroad tracks **
- CB4:
The Spaulding culvert as it emerges from the building
- CB5:
Underneath the overhang of the Memorial Union Building
- PB1:
Pettee Brook sample for comparison to College Brook; located
above the New England Center at the emergence of the culvert which
passes under Emerson road
**CB0 and CB3A are both new sites and are not included in the old
data. CB3 was included in the old data, but is now below Rudman Hall.
|
|
 |
| The campus Sustainability
Program and WRRC have funded a long term water quality monitoring
program to ascertain the ecological health of the College Brook
watershed and the UNH campus. |
|
|
 |
|
 |
 |
 |
 |
 |
|